Asapi
For AI labs / Capabilities / Sequential decisions under time and uncertainty
Capability · 18 environments

Sequential decisions under time and uncertainty

In these environments a decision's value shows later: cash that must last 13 weeks, stock for repairs, seats that sell out as the clock moves, servers that overheat during phone calls, equipment plans priced over one or three years. The agent has to look ahead, finding the facts first.

How plans are priced

A plan is scored by what it would do

Cost models
Two equipment plans are priced by a profit model over 12 or 36 months, from the manager's own plan or patching the old unit (0) to the best plan found (1): by exhaustive search of 51,121 candidates, 18,688 of them valid, and in a search of 41,268 valid plans.
Margins
In the 12‑month plan, a valid plan within a fixed margin of the best scores 1. The three‑year plan has no band, and its best plan stays best over any horizon from 15 to 36 months.
Profit with checks
In the seasonal bulk order, 70% of the reward is profit played out from the final state: from saying yes to the whole order as things stand (0) to the most profitable outcome the staff can carry out (1).
Household plans
The solar plan is scored on paying routes over time against a rebate deadline and a card limit. The savings plan's fund and target months are checked against bands a cash‑flow model computes from the plan's own figures. The smart‑home plan must fit a budget and wire up in simulation.
Commitments in simulators
Daily delivery windows with a pass mark; doses and tests on a ward; items on site before their stage; stock plans checked at weeks 4 and 8; a bank limit that moves with unpaid invoices; coffee bought ahead of seasons and disruptions; an order desk's stock through a Christmas peak.
A clock that moves
In the flight rebooking, each page, form and message moves an in‑world clock, and seats on alternative flights sell out at fixed times, the same in every attempt. In the server‑room incident, a phone call costs five world minutes while the room heats.
Uncertainty
Some suppliers' real lead times differ from their quotes; one sales tip becomes an order and another doesn't; a forecast is too high and a closure warning is withdrawn; trucks wear out; buyers pay late. The facts sit in records and with people.
Optimality
In the course registration for earliest graduation, one check passes only for the class the answer key takes as the route to graduating soonest, of three sharing a time slot; keeping the class already held breaks no rule.
Who decides
Code alone in 12 of the 18. In the bulk order, the solar plan, the savings plan, the cancelled‑flight rebooking, the smart‑home build and the server‑room incident, two LLM judges also decide checks on the plan, note, report or app (in the smart‑home build, possibly one Codex session).
What models get wrong

They take the plan they're handed, and don't look ahead

Each count covers every model tested on the environment, with only the request; where a model made several attempts, the line says so.

  1. The request taken as the plan. 12‑month equipment plan: 8 of 13 attempts, one per model, ordered only the cabinet the manager asked for and scored 0; a ninth added more and scored 33%. The four that found the old one's fault and repaired it scored 44–100%.

  2. The listing trusted. Three‑year repair‑or‑replace plan: 6 of 12 attempts never asked when a new cabinet could arrive, missed the stock delay behind the listed time, ordered no stop‑gap repair and left the shop with no ice cream to sell over Easter. The other six patched the old one.

  3. Asking too late. Tea‑factory cash desk: in the hardest scenario that needs the owner's money, where the largest credit buyer stops paying, 2 of 5 attempts asked too late, and the factory went under before it arrived. Opus 5.5 and Sonnet 5.5 asked in time from the same books.

  4. The shops left short. Seasonal bulk order: 8 of 8 attempts, one per model, left the bakery's own shops short in at least one week, against the owner's standing rule that the shops come first. Told the rules, 5 of 8 kept them whole.

  5. The real tip left uncovered. Coffee roaster materials planning: in 9 of the 13 windows that reached it, no coffee was bought or put on hold for the sales tip that became an order; GPT‑6.1 Sol held it in both its windows.

  6. Calls before the stopgap. Server‑room cooling incident: in 7 of 7 attempts, one per model, the agent made calls or chased the cause first, two never starting a stopgap, and the servers shut down on heat 15 to 20 minutes in.

Results

20 full solves, in seven of the eighteen

Each dot is one attempt with only the request; the line marks the median. Larger dots are full solves.

Hover a dot for its model and reward.

The 18 environments

How each one prices the plan

EnvironmentHow it tests thisChecksModelsBest, request onlyBest, told the rules
12‑month equipment plan with simulated shop managerSmall business (bakery chain; one shop's equipment)A profit model prices the plan over 12 months, from the manager's own plan (0) to the best of 51,121 candidate plans (1).Cost model13100%100%
Seasonal bulk order run with simulated staffSmall business (bakery chain supplying a hotel group)70% of the reward is profit, pricing production, overtime, agency hours, freezer space, an oven service and a rebate band across the order's weeks.23888%96%
Household solar purchase plan with simulated contactsHousehold (family home; the owner's brother pays the power bill)The plan is scored on paying routes over time, such as cash, finance, card instalments or waiting, against a rebate deadline and a card limit.821078%100%
Month‑long parcel fleet dispatch, notes‑only memoryCity parcel carrier with three hubs and a mixed van and box‑truck fleetPromises face a daily pass mark; worn trucks need the one workshop bay before they break; two missed days in a row end the trial.292100%–
Room furnishing from photos: measure, match look‑alikes, order and planA furnishing concierge's assistant, with the firm's trade accounts at three furniture web shops, on 1 February 2027, furnishing a client's flat like the building's staged model apartmentThree pieces arrive in time from only one shop and each order adds a delivery fee, so splitting across shops and orders decides budget points.28880%99%
Live server‑room cooling incident in a 3D building with model‑played staffA police station's facilities duty engineer (FM company), in a 3D model of the station, at the alarm that both live server‑room cooling units have stoppedWith no cooling the servers shut down on heat within minutes and each call takes several, so a stopgap must come before calls and cause‑finding.31777%100%
Three‑year repair‑or‑replace plan with simulated managerSmall business (bakery chain; one shop's equipment)A 36‑month profit model prices lead times, warranties, energy and display pans, from patching the old unit (0) to the best of 41,268 plans (1).Cost model1299%99%
Cancelled‑flight family rebooking against a ticking clockA travel concierge's trip desk on the evening a family's overnight flight to a wedding abroad is cancelledSeats on alternative flights sell out at fixed in‑world times as the clock moves with each page and message; checks reward securing seats first.61–63885%99%
Household savings plan from records and familyHousehold (multi‑generation family home)Bands a cash‑flow model computes from the plan's own figures check its two target months; separate checks cover the fund, debt order and coming bills.51889%98%
Smart‑home retrofit: purchase plan, wiring and local control softwareA small, old terrace house with no smart setup, an always‑on Mac mini, two iPads, a phone and an electrician who wires only from a tableThe plan must fit the budget with no vendor cloud or hub, pass a circuit simulation, and store footage for the period asked.121792%96%
Course registration optimised for earliest graduationUniversity course‑registration web portalOne check passes only for the same‑slot class the answer key takes as the route to graduating soonest; an audit disputes it.14179%–
Tea‑factory cash desk over thirteen weekly sessionsFinance desk of a tea factory that sells to trade buyers and at auction, with a bank facility and an owner who can lendThe bank limit moves with unpaid invoices and the factory fails the day it's exceeded, so offers and auction timing need a daily forecast.645100%–
Coffee roaster materials planning across two seasonsMaterials planning at a coffee roaster with contract customers, green‑coffee importers, packaging makers and a shipping lineCoffee and packaging must be bought ahead of seasonal demand and disruptions, within storage caps and shelf life, with each month's break‑evens in band.114–168597%–
Coffee web‑shop order desk through a four‑act Christmas peakOrder desk of a coffee roaster's web shop, subscriptions and trade counter, with two carriers, a payment gateway, a warehouse, a roastery and a helpdeskSecond shifts must be booked ahead, large orders picked on days with room and short coffees taken off sale in time, within each act's allowance.207–213594%–
Two‑site spares pick lists and stock plansSpare‑parts stores at a coffee roaster with two sitesStock plans must keep each site's downtime‑risk figure under the limit at weeks 4 and 8, within caps on weekly orders, plan size and drawers.356100%–
Three‑day hospital ward care coordination, notes‑only memorySimulated hospital ward with five patients, nurses on day and night shifts, physicians and a diagnostics departmentDoses must land in their windows and tests need preconditions, fasting and transport arranged ahead of booked slots, with self‑set wake‑ups capped.290–4156100%–
Two‑site spares buying through supplier part withdrawalsPurchasing for the spare‑parts stores of a two‑site coffee roasterReplacements must be accepted, coded and ordered early enough for the real lead time, in quantity for both sites, within a monthly budget.625100%–
Packing‑line project purchasing over twelve mail‑driven weeksNew packing‑line installation at a coffee roaster's site, with a design consultancy, a machine maker and an electrical contractor11 items, some added by design revisions, must reach site by the working day before their stage, and quoted lead times can mislead.146100%–

Cost model: the reward prices the agent's plan, from a baseline plan (0) to the best a search found (1). Told the rules: both equipment plans get the manager's records, and the room furnishing the measured floor plan and piece list. A range: varies by attempt. A dash: not tested.

Known limitations

What we haven't measured

Try a sample environment

Three are downloadable as Harbor tasks, with graders and reference solutions. Request one with your work email, or book a call about the other 53.